My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP36419
DRMS
>
Back File Migration
>
Report
>
REP36419
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:14:13 AM
Creation date
11/27/2007 7:27:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
7/9/1981
Doc Name
Geotechnical Site Evaluation for Proposed Surface Facilities
From
Chen and Associates
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 4 - <br /> fill sections required to obtain grade will typically be kept to a <br />1 minimum with the exceptirn of the cvt into the steep north-facing <br /> slope separating the lower and upper portions of the site. We under- <br />' stand the roadway will be asphalt surfaced and designed for an <br /> equivalent 18 kip axle loading. <br /> Bridge Improvement: The repair will consist primarily of recon- <br /> struction of the abutment mertbers together with the bridge decJc <br /> members as required. The bridge center supports will probably rot to <br />1 replaced. <br /> Ponds: Three ponds to retain surface runoff and two ponds for <br />' fresh water storage are proposed. Structures will be earthen and <br /> typically 20 feet deep. A hillside slope method of construction will <br /> generally be used with cut and fill depths ranging to maximums between <br /> approximately 10 to 25 feet. Water depth will typically be a maximum <br /> 15 to 17 feet with the exception of runoff pond #3 which will only be <br /> about 5 feet. Fresh water prods are anticipated to have a relatively <br /> constant water level, whereas the runoff ponds will fluctuate. <br />' Potable Water Plant: The system will consist of a 150,000 gallon <br /> water storage tank and a small water treatment plant. Minor excava- <br /> l <br />d <br />li <br />i <br />d f <br />t <br />t <br />k <br />ill b <br />t <br />i <br />b <br />h <br />t <br />Th <br /> ee <br />an <br />on are ant <br />pate <br />s <br />ures. <br />an <br />w <br />e s <br />c <br />or <br />ot <br />ruc <br />e <br />1 have a height of 15 feet. <br /> Wastewater Treatment: ThP treatment plant will consist of a <br />' relatively small pre~ngineered system located along the North Fork <br /> Gunnison River. Loadings are assumed to be relatively light. <br /> Railroad Spur: The spur will consist of an approximate three- <br /> quarter mile alignment along the north bank of the river to service <br />, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.