Laserfiche WebLink
• RAG EMPIRE CORPORATION WASTE PILE INSPECTICIN FORM <br />PILE I.D. NO. 1211-CO-09-01370-O1 (SURFACE WASTE PILE) <br />PII.E I.D. NO. 121 I-CO-09-01370-02 (OLD NO.9 EXCAVATION) <br />INSPECTOR SIGNATURE:~~%4~,~ ~J~ <br />INSPECTOR TITLE: CM-+- . ~~ <br />Under the supervision of Michael Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />A. Stability of fill (quarterly inspection) <br />ti~B. Critical construction periods: <br />_I. Removal of all organic materiaUtopsoil <br />_2. Placement of underdrainage system <br />• _3. Installation of surface drainage system <br />_4. Placement and compaction of fill materials <br />_5. Revegetation <br />NOTES: <br /> <br />file:I:~EN~ENVIRONMENTAUEMPIREVNSPREP\WASTEPI LEPORM.DOC ~ `~; ~,~~~r <br />