Laserfiche WebLink
<br />• RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I.D. NO. 121 I-CO-09-01370-O1 (SURFACE WASTE PILE) <br />PILE I.D. NO. 12] 1-CO-09-01370-02 (OLD NO.9 EXCAVATION) <br />DA <br />i <br />INSPECTOR SIGNATURE: I%~./l ~fi~l~ <br />INSPECTOR TITLE: ~.~? z- ~~~ <br />Under the supervision of Michael Ludlow, Colorado P.Ii. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(1 I). <br />This inspection was conducted to evaluate: <br />~. Stability of fill (quarterly inspection) <br />~" ~~ B. Critical construction periods: <br />I .Removal of all organic materiaUtopsoil <br />2. Placement of underdrainage system <br />• 3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: <br />..~p,~~.nn,;~, . <br />~~='.a 4 <br />file:I:~EN~ENVIRONMENTAUEMPIREUNSPREP\WASTEPILEFORM.DOC ~ ~; ,•~ ~.. <br />;V~ <br />6' '•Y <br />_.~? 24046 ~ ~_ <br />