Laserfiche WebLink
F1 ~ <br />S, <br />CERTIFICATION <br />To the best of my knowledge, based on my professional expertise, the permanent refuse structures <br />at the Deserado mine are being constructed in conformance with the prudent state-of--the-art <br />construction practices as they relate to coal processing waste bank construction. Further, the <br />structures are being constructed in compliance with the approved design, as specified within <br />Section III-20 of the approved permit documents and depicted on Maps 76,77,82 and 83. <br />I certify, based on my field observations and those observations of my qualified designates and <br />professional investigations, as detailed above, that the permanent refuse disposal structures at <br />Western Fuels-Utah Inc., Deserado Mine, located in Rio Blanco County, Colorado, are being <br />constructed in compliance with the design approve as a portion of Permit No. C-018-81, issued <br />by the Colorado Mined Land Reclamation Division. <br />Respectfully, ~ ~ <br />Michael J. Weigand, P.E. ~ ;>~:.':E~; ~ <br />~; • ~ ~wE~ . f,~ <br />Mine Manager ' ;~ e~ 9~. o <br />Z• <br />7v 19143 of <br />Colorado Registered P.E. No. 19143 q;.~ ~ ~ <br />MJW:WCI -'BHA L <br />xc: Murari Shrestha <br />Jeff Dubbert <br />Tim Chervick <br />