My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP35645
DRMS
>
Back File Migration
>
Report
>
REP35645
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:12:58 AM
Creation date
11/27/2007 7:11:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Name
APPENDIX 1-B TO BLUE RIBBON COAL COMPANY TR REQUEST MINE BENCH STABILIZATION
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_~ <br />the slope laterally. Locations and details of subsurface <br />_, drainage are shown on Figure 9. <br />' S.7 MATERrAr_. HANDLING ~jjZ PLACEMENT <br />During the excavation process, segregation of the material, i.e., <br />removal of cobbles and boulders, and organic materials and mixing <br />_ of the remaining materials, will be required in order to assure a <br />- consistent and uniform fill area. Cobbles and boulders will be <br />stockpiled and later utilized as an abutment and flood wave <br />protection at the base of the stabilized mine bench. Soil cover <br />material will be obtained from bench fill material, with the <br />exception of the observed coal waste material. These materials <br />will be stockpiled during construction. Cover materials will be <br />placed in stages over the coal waste in order to keep pace with <br />placement of coal waste. This will be performed in order to <br />avoid problems with stockpiling of materials and placement on <br />high-steep slopes. Following placement of the soil cover, rock <br />rip-cap material will be placed at the toe to provide erosion <br />protection within the assumed flood plain area and to provide <br />added surcharge and resistance at the toe of the slope. Once <br />construction operations are completed, reclamation and <br />• revegetation procedures will be implemented. Specific conditions <br />of reclamation and surface drainage will be provided by Blue <br />Ribbon Coal Company. <br /> <br /> <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.