My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP35642
DRMS
>
Back File Migration
>
Report
>
REP35642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:12:58 AM
Creation date
11/27/2007 7:10:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
Report
Doc Date
9/3/1982
Doc Name
ANNUAL FEE FN 77-129
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;~-. <br />.o a <br />SAND & GRAVEL <br />PRODUCTS <br /> <br />WN(TEWATER-BUILDING MRTERIALS CORPORATION <br />Phone Z42-4845 of i4i-Td37 P. O. Boz 1789 <br />94~ Sontb 10th Skxet <br />GRAND JONC740N, COLORADO 81b01 <br />September 1, 1982 <br />READY MIXED <br />CONCRETE <br />~E~EIVED <br />Mined Land Reclamation Division <br />1313 Sherman Street, Room 423 <br />Denver, CO 80203 <br />Gentlemen: <br />Re Annual Report - MLR File No. 77-129 <br />Whitewater Pit 500-Mesa County <br />s ~_ F~ s tsaz <br />MINED LAND RECLAMATION <br />bolo. Dept. of Natural Resource <br />Mining and reclamation are proceeding on schedule in accordance <br />with the mining and reclamation plans and timetables in the <br />amended application submitted in 1981. <br />Reference is made to MLRB Rules and Regulations, Section 2.40: <br />2.41(1)(a) Mining continued in amended Stage 1 on 8.54f acres <br />(see attached map). Mining in this area will not be <br />complete at the end of the reporting year. In addi- <br />tion to the mining in amended Stage 1, approximately <br />0.19f acres in Stage B was mined, and mining continues <br />on the 3.Ot acres in Stage D initially disturbed last <br />year. <br />(b) Stripping continues ahead of mining in Stage 1. At <br />this time, approximately 7.821 acres are stripped; <br />an additional 1.91f acres are cleared of all trees. <br />(2)Backfilling continues in Stage Y. We have started shaping <br />the river banks above the waterline in Stage Z. No reclama- <br />tion is scheduled at this time on any other stages. <br />(3)Backfill on 15f acres in Stage Y; shaping on 5t acres in <br />Stage Z. <br />(4)No planting was scheduled for this year. <br />(5)No fertilizing was scheduled for this year. <br />(6)It now appears that revegetation efforts in Stage X are largely <br />unsuccessful. Aprroximately 6.451 acres are scheduled for <br />revegetation, but to date all efforts have shown dismal <br />results. We are not sure why results have been so minimal. <br />Soil testing has not indicated a reason for the poor results. <br />Reexamination of the seed mix, seeding procedures and other <br />factors likewise have suggested no reason for the results <br />obtained. The SCS suggested the original mix, but they are <br />unable to explain the failure.Local ranchers and farmers <br />are no more successful than we in making this desert bloom. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.