<br />Yoast Mine 2002 Annual Reclamation Report <br />2002 Disturbance Area <br />The Yoas[ Mine 2002 Reclamation Map shows the limits of disturbance as of December 31, 2002. The <br />disturbance line as shown on this drawing depicts all disturbance associated with the mining operation <br />including haul road and pond construction, topsoil removal and storage, open pits, spoil piles, etc. The area <br />disturbed during 2002 totals 60.0 acres. <br />Backlilline and Gradine <br />During 2002, SCC graded a portion of the active pi[ spoil. This area totals 33.5 acres and is shown on the <br />Yoast Mine 2002 Reclamation Map. <br />.) Soil and Spoil Monitorine <br />SCC is required by Permit C-94-082 to monitor the salvage, storage, and redistribution of soil and spoil <br />handling operations at Yoas[ Mine. Specific programs include documenting soil recovery, verifying soil <br />redistribution thickness, determining final graded spoil quality, determining soil fertility, evaluating plant <br />rooting characteristics, recording the source of replaced soil, and completing an annual soil balance. The <br />following sections present the soil and spoil monitoring data for [he 2002 calendar year. <br />Soil Recovery Documentation <br />Soil recovery was documented by daily observation by the grading foreman and pit supervisor. This quality <br />control information is used to verify soil salvage estimates predicted from the baseline soil survey, confirm <br />soil map unit types, justify salvage thickness, and evaluate soil suitability. Soil salvage occurred in advance <br />of the active pi[ during the 2002 field season as shown on the Yoast Mine 2002 Reclamation Map. All <br />topsoil salvaged during this period was placed in stockpiles M, O, P, Q and R (see Table 00.1). <br />SCC will continue [o closely monior soil-handling operations during [he 2002 field season. Only suitable <br />sources of soil within the disturbance area will be salvaged [o ensure the reclaimed areas are restored to [he <br />• desired posttnine land uses. SCC will obtain variances pursuant [o Rule 4.06.2(2) and Perini[ C-94-OR2 <br />whenever suitable soil cannot be salvaged exclusively from any map unit because of equipment limitations or <br />operator safety concerns. <br />2 <br />