My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP35564
DRMS
>
Back File Migration
>
Report
>
REP35564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:12:52 AM
Creation date
11/27/2007 7:09:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989065
IBM Index Class Name
Report
Doc Date
4/26/2004
Doc Name
2004 Annual Report
From
Schmidt Construction Company
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Expected Activity (2004/2005): The Cut Stone quarry area is not expected to change appreciably. The cut <br />stone stockpile location has been moved to the main quarry area where the cut stone can be distributed more <br />efficiently. Although the former area of the stockpile was expected to be revegetated in the last year, that was <br />not done. As it tamed out, a location fox storing cutstone that did not meet the cutting requirements (improper <br />rock structure and grain) was needed. That stockpile is periodically reduced by hauling the discarded cutstone <br />material to the main quarry where it is crushed and used in other products. Other portions of this part of the <br />operation will remain as they currently axe. <br />Some additional backfilling will occur in the main quazry in preparation fox additional reclamation. <br />About one acre was backfilled in the last yeaz. This will be added to during the summer when topsoiling cannot <br />be done. In the fall it will be topsoiled and seeded. <br />In the event the mining on the north end of the main quazry is completed in the next year (not likely), <br />then development will begin on the south end of the quarry in prepaxadon fox moving south. This was expected <br />to occur last year, but as it turned out there was more than enough material left on the north end of the main <br />quarry area to supply the needs and the remainder will likely supply the needs for the next year. The market fox <br />this type of rock has slowed somewhat which has resulted in a slowing of the expansion rate of the quarry. It is <br />questionable as to whether the main quarry will move any further north on the current mining "finger." The <br />rock quality is still suitable, but the physical dimensions of the end of the "finger" axe quite limiting. <br />Bonding: This operation is covered by a self bond. A copy of the latest financial statement is enclosed (only <br />provided to DMG). <br />M-1989-065 Winkler Light Aggregate Quarry <br />Schmidt Construction Company 2004 Annual Report Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.