landforms. Sufficient topsoil would be placed so as to allow re-establishment of a native <br />vegetation community on all disturbed areas to fulfill resource protection goals. Erosion control <br />measures and drainage management will control site drainage and ensure that off-site water <br />quality is not compromised. The park staff would approve all erosion control. <br />Revegetation would consist of reseeding for two complete years, using a native seed mixture <br />approved by the NPS. Planting of sagebrush maybe required at certain locations along the <br />slope. The operator must monitor and control exotic species and noxious weeds between both <br />seedings and for two years after the final seeding. Reclamation activities must commence no <br />later than 6 months following the conclusion of mining and be completed within 2 years of <br />commencement. All reclamation work would be monitored by park staff to ensure that the work <br />conforms to the reclamation plan. All final reclamation design and procedures will be approved <br />by the Superintendent. <br />2.li. Mitigation <br />Mitigation under Alternative A consists of the provisions in the Special Use Permit issued in <br />2000. These are summarized in Table 2.1. Mitigation for Alternative B would include provisions <br />included in the Plan of Operations submitted by the operator and additional mitigation stipulated <br />as a condition of approval by the NPS or other entities. Mitigation for Alternative B is <br />summarized in Tables 2.2 and 2.3. Table 2.2 lists the mitigation as specified by the operator <br />and as specifically described in the operator's submittals to date, and Table 2.3 lists NPS- <br />required or other agency-required mitigation. <br />Table 2.1 - Alternative A -Mitigation Measures <br />(Per the Existing Special Use Permit #IMR-CURE-5300-001) <br /> Mitigation Measures under <br />Number Actions Reference <br /> . Alternative A, No Action <br />1 Drilling/Blasting Transportation, use, and storage of explosives must Permit Provision <br /> com I with all federal, state, and local re uirements. No. 13 <br />2 Crushing Crusher shall not remain on site for more than 90 days Permit Provision <br /> unless a roved in writin b the Su erintendent. No. 10 <br />3 Hauling All vehicle traffic will be confined to existing roads and Permit provision <br /> Materials access roads. No. 14 <br />4 Waste All wastes will be disposed of promptly at an approved Permit Provision <br /> Dis oral location outside the National Recreation Area. No. 16 <br />5 Waste No burning of wastes is permitted. Permit Provision <br /> Dis osal No. 16 <br />6 Waste Chemical toilets or other selfcontaining sanitation Permit Provision <br /> Dis oral facilities are re uired. No. 16 <br />7 Waste Any fuel or other contaminating substance spilled must Permit Provision <br /> Dis osal be cleaned u No. 76 <br />8 Waste Superintendent must be notified of any spill exceeding 20 Permit Provision <br /> Dis osal allons. No. 16 <br />9 Chemical use Use of pesticides is prohibited unless approved in writing Permit Provision <br /> b the Su erintendent. No. 17 <br />10 Visitor safety Signage must be posted at access road gate during Permit Provision <br /> o erations to revent unauthorized ent b ark visitors. No. 18 <br /> Erosion and All sediment control structures must be inspected and Permit Provision <br />11 Sedimentation maintained regularly. No. 20 <br /> Control <br /> <br />12 Erosion and <br />Sedimentation The Superintendent can require modifications or Permit Provision <br /> <br />Control additions of sediment control structures if needed. No. 20 <br />ZO <br />