Laserfiche WebLink
i~ <br /> <br /> <br />1 <br /> <br /> <br /> <br />DIVISION 1 -GENERAL REQUIREMENTS <br />SECTION 01100 -SPECIAL PROJECT PROCEDURES <br />PART 1 -GENERAL <br />All work required for this project is to be accomplished in accordance with the contract drawings <br />and specifications. In addition, the following special construction procedures shall be followed at <br />the designated locations. <br />PART 2 -NOT APPLICABLE <br />PART 3 -EXECUTION <br />3.01 GENERAL <br />A. Construction Sequence <br />The Contractor shall submit a proposed construction sequence to the Engineer for approval. <br />END OF SECTION <br />07(97 <br />Section 01100 -Page 1 of 1 <br />