Laserfiche WebLink
<br />DIVISION 2-SITE WORK <br />SECTION 02100 -SITE PREPARATION <br />PART 1 -GENERAL <br />1.01 WORK INCLUDED <br />Clearing trees and brush from the slurry wall alignment and stripping upper soil layer to prepare for <br />placement of new impervious fill. <br />1.02 RELATED WORK <br />Section 02290 -Fill Area Construction <br />PART 2 -NOT USED <br />PART 3 -EXECUTION <br />' 3.01 GENERAL <br />~:J <br /> <br /> <br /> <br /> <br />~1 <br />r <br />L~ <br /> <br />' 07/97 <br />The Contractor shall, by their own investigation, determine the extent and effort of clearing required <br />in accordance with this section. <br />3.02 CLEARING AND GRUBBING <br />Clearing of the ground surface along the slurry wall alignment and in fill areas will be at the direction <br />of the Engineer. The area to be occupied by the permanent construction required under these <br />specifications and the surfaces of all borrow pits, stockpiles, and fill areas shall be cleared of all trees, <br />stumps, exposed roots, brush, rubbish, and other objectionable matter as determined by the Engineer. <br />3.03 STRIPPING <br />The fill areas shall be stripped to a depth of 6 inches or to a sufficient depth, as determined by the <br />Engineer, to remove all unsuitable materials. The unsuitable materials to be removed by stripping <br />shall include all surface boulders and loose rock, debris, topsoil, vegetable matter, including stumps <br />and roots, and all other perishable and objectionable materials that are unsuitable for use in <br />permanent construction required under these specifications or that might interfere with the proper <br />bonding of the embankment with the foundation, or the proper compaction of the fill materials, or <br />that may be otherwise objectionable as determined by the Engineer. <br />3.04 DISPOSAL <br />Materials from clearing operations shall be removed from the construction site or otherwise disposed <br />of as approved by the Engineer. <br />Waste piles shall be located where they will not interfere harmfully with the natural flow of the <br />stream and drainage channels, with construction operations in the borrow areas, or with the <br />operation of the reservoir. Waste piles shall be leveled and trimmed to reasonable regular lines. <br />END OF SECTION <br />Section 02100 -Page 1 of 1 <br /> <br />