Laserfiche WebLink
<br />4. Column of Smax total shall be included in future reports <br />as taken from the original elevation. <br />5. Give more detail in the narrative introduction on the <br />angle of draw, results of monitoring rows, downdip and <br />updip of gob. <br />6. Figure 60 explanation is: E and F seam total Smax <br />7. Monuments S7-S17 will be measured when second panel of <br />mining of E seam is complete. <br />8. Send 7-12/91 report- already sent per request. <br />9. 7-12/92 report to be sent - already sent per request. <br />This concludes the review of 1991 and 1992 subsidence reports. <br />(Whew- heavy sigh of relief to get this one off my desk...) <br />I'm available for review if you must, but I hope my background <br />information gave you the basics to look this over... <br />