Laserfiche WebLink
PROPOSED 1990 MONITORING <br /> With the reclamation phase of the mine now in progress, monitoring of water quality and quantity will <br /> continue on a quarterly frequency with the same parameters. All stations currently being monitored will be <br /> continued through June, 1990,when the reclamation activities are projected to be complete. At that time,no <br /> further surface and groundwater sampling would be conducted. NPDES sampling and monitoring would be <br /> continued as required by that permit. <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br />