My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP33937
DRMS
>
Back File Migration
>
Report
>
REP33937
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:10:32 AM
Creation date
11/27/2007 6:41:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
1/13/1998
Doc Name
REVIEW OF MCC RESPONSES TO DIVISION REVIEW OF 1996 ANNUAL HYDROLOGY REPORT WEST ELK MINE PN C-80-007
From
DMG
To
MOUNTAIN COAL CO
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Johnston <br />Mountain Coal Company <br />Page 3 <br />January 13,1998 <br />14. A response is provided below for each of the paragraphs addressed in the Division's <br />review letter dated November 12, 1997 and in MCC's response dated December 1 I, <br />1997. <br />• No further response is required at this time. <br />• No further response is required at this time. <br />• No further response is required at this time. <br />• Alternate methods of measuring flow are available and should have been <br />employed if the flume capacity was exceeded. No further response is <br />required at this time. <br />• MCC did not provide a response to this item. <br />• Required analytical parameters were not collected and reported. No <br />further response is required at this time. <br />• No further response is required at this time. <br />15. A response is provided below for each of the paragraphs addressed in the Division's <br />review letter dated November 12, 1997 and in MCC's response dated December 11, <br />1997. <br />No further response is required at this time. <br />Several required analytical parameters for the baseline monitoring <br />program are missing from Appendix F for Springs 26-1, 27-1, and l5-l. <br />Also, please note that the baseline monitoring schedule requires that <br />samples be collected for chemical analysis in April (weather permitting), <br />June and September. No further response is required at this time. <br />Some of the required analytical parameters were not collected and/or <br />reported. No further response is required at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.