Laserfiche WebLink
OFFICE 303 2a~-OI 18 <br />7 <br />7 <br />FRED M. JOHNSON, G.P.G. <br />GEOLOGIST <br />P.O. BOX 21 62 <br />DURANGO.COLORADO 81302 <br />January 2, 199. <br />TO: National King Coal, Inc. <br />RESIDENCE 2d7-3560 <br />SUBJECT: Quarterly Inspection, Huntington Ditch, Fourth Quarter, <br />1991 <br />1) The Huntington Ditch was inspected once during the month of <br />October, fourth quarter of 1991. No other inspections were <br />possible because of snowfall. <br />2) The ditch is in good condition and has generally been kept <br />clear of plant growth. <br />3) Particular attention was given to inspection of the realigned <br />area over Mining Section 1 North. <br />4) No evidence of leakage or damage due to effects of underground <br />mining was observed. <br />5) The purpose of this inspection was to insure protection of <br />the Huntington Ditch and the King Coal Mine as well as to meet <br />requirements established by the Colorado Mined Land Reclamation <br />Division for quarterly inspection of the Huntington Ditch. <br />~ ,~ .' <br />A/ /` /' <br />~ / M ~~` `~: V r <br />ed M. Jo / o)i, C.P.G. <br />V,~ <br />