My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP33869
DRMS
>
Back File Migration
>
Report
>
REP33869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:10:16 AM
Creation date
11/27/2007 6:39:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Report
Doc Date
12/30/2002
Doc Name
Consent Decree Monthly Reports
From
Sunnyside Gold Corp
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November Monthly Report - 2002 <br />Page 2 <br />"B List" Projects <br />• Columbus Mine Portals -Mine Waste Dumps <br />• London Mine Portals -Waste Dumps <br />Work, permitting or arcangement for access is not planned until it becomes evident that <br />the work plans for these projects require implementation. <br />• Mayflower Facility -Upland Hydrological Control <br />• Tailings Pond No. 4 Surface Drainage Modification <br />• Tailings Pond No. 4 Upland Groundwater Diversion <br />DMG has inspected the sites and approved the projects as complying with the work plans <br />and MLR Standards. <br />Of the diversions, only Drainage C of the Mayflower Facility -Upland Hydrological <br />Control Project was actively diverting water continuously at month end. Snowfall <br />covered the areas at month end and with the dropping temperatures no flows are expected <br />until spring from the Drainage A, Drainage B and the Tailings Pond #4 Diversions. It is <br />anticipated that snow cover will prevent any more inspections until spring at these sites. <br />Cement Creek Diversion and Water Treatment <br />Cement Creek diversion and water treatment was active throughout November with all of <br />the flow being diverted. All of the American Tunnel flow was treated throughout the <br />month. Permanent grouting of the pipe in the American Tunnel No.3 bulkhead is <br />scheduled to occur in early December. <br />The November 2002 monitoring results for; dissolved metals in the AT-004 discharge; <br />Cement Creek (CC-1B); American Tunnel flow before treatment (AT-INFEL); and <br />Cement Creek below the AT-004 discharge point (CC-20) are attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.