Laserfiche WebLink
:~ <br /> <br />C-81-044: Amoco Pipeline. M. Middleton 2 <br />•Would any light use or access roads be required to conduct this operation? <br />•How would protection of the topsoil resource along the pipeline corridor be <br />protected? <br />As we have discussed, until the Division is actually informed of the details of Cyprus's plan <br />we can not foresee all adequacy questions we will have. From our initial discussions with <br />you regarding the general plans, these are items we feel may need definition. <br />Included with this letter is a copy of Technical Revision No. 23 appli<:ation page you had <br />requested and the copies of the summarization of Cyprus Empire's surf~ice and groundwater <br />monitoring plans. I also want to confirm that I received your fax regarding extension of time <br />for submittal of the Eagle No. 5 and 9 Mines AHR. As usual, if you need to discuss these <br />or other items with me, just call. <br />Sincerely, <br />~.!/NM <br />et Bi ~~11 <br />nviro ental P otection Specialist <br />Enclosures <br />m: \coal~jhb\C81044\pipeline <br />