Laserfiche WebLink
~;` <br />The operator has responded that high flows precluded flow <br />measurement in April for site H-1. The operator also provided <br />some discussion and background information with regard to <br />sites NF-1 and NF-2 and their proximate location. I recommend <br />no further action with regard to the 1994 AHR. <br />I also discussed the Division's position with Mr. Tom Anderson with <br />regard to the expanded text discussion related to the PHC that the <br />Division would like to have included in the AHR text. I also <br />concurred that samples or visits should not be conducted or taken <br />if it jeopardizes someones physical well being. Mr. Anderson also <br />agreed to bail wells SC-1 and SC-2 and take conductivity readings <br />to determine if that would change the readings. <br />