My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32997
DRMS
>
Back File Migration
>
Report
>
REP32997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:09:15 AM
Creation date
11/27/2007 6:23:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982155
IBM Index Class Name
Report
Doc Date
12/24/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ <br />' Y ~. <br />~ NoCice of Int ei« ~., 999...__._- _i Wing Operations <br />• , 112c Construction Materials Annual Report <br />Permittee Name: <br />Permit No. . <br />Operation Name: <br />Anniversary Date: <br />Total: <br />1. <br />2. <br />3. <br />4. <br />5. <br />6 : - <br />R«: 1o v~ <br />ct\' ooh 5 b~ <br />RECEII/CD <br />DEC 2 4 199] <br />Centennial Materials, Inc. <br />M-82-155 <br />Fountain Pit I)IViSI0001 A1irlar~ih6 bBC,0~} <br />December 31, 1997 <br />$550.00 (Due on your Anniversary Date) <br />a. Permitted acreage: 693 b. County where mine is located: E1 Paso <br />Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? ORE LESS <br />Does this mine have a phased reclamation plan? YES NO <br />Total acres affected during the report year:' 62.0 <br />Total acres reclaimed for the report year:* 21.9 <br />T~d tal number of acres-in~ topsoil rep~l acement stage: 21.9 <br />a. Average thickness of topsoil replaced: 8" to 10" or more <br />7. Total number of acres seeded: 0 in 1997 <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: N/A <br />a. Date reclamation began: N/p <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* none <br />10. Estimated total acres to be affected in the next report year:* 70± <br />11. COMMENTS: see annual rennrt. ma na anA aA~ii t.i nnal ch ea+._ <br />* Please show the location of the acreage for items 4 - 6 on your map** <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: Jp `4 .Q'( .~ Date: 1P_2/~_1gg7 <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: Scott, Davis <br />Company: Schmidt Construction <br />Address: 2635 Delta Drive <br />Colorado Snringc CO A0910 <br />Phone: ( 71 ~'~q7_/i~07 <br />FAx No: ( 719 1392-4245 <br />Federal Tax ID No. or Social Security No.: _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.