Laserfiche WebLink
1 <br />' to rehabilitate said liner subgnde(s) to approved conditions as outlined in this Specification prior <br />' to resumption of additional liner placement. <br />2.5 Communications <br />All notices, demands, requests, inswctions, approvals, proposals, and claims must be in <br />' writing. <br />Any notice to or demand upon the Contractor shall be sufficiently given if delivered at the office <br />' of the Contractor, stated on the signature page of the agreement (or at such other office as the <br />Contractor may from time to time designate in writing to the Owner), or if deposited in the <br />' United States mail in a sealed, postage-paid envelope, or delivered with chazges prepaid to any <br />telegraph company for transmission, in each case addressed to such office. <br />' 2.6 Schedule of Work <br />' The Contractor shall develop a schedule of work for the Engineer's approval to complete the <br />conswction. In no instance shall approval by the Engineer be considered to absolve the <br />Contractor from the responsibility of performing the required work or of protbcting the work <br />in interim work stages, or from protecting the work completed prior to final acceptance by the <br />Engineer. <br />In preparing the work sequence, the necessity of obtaining borrow from mandatary ezcavadons <br />within the disposal azea and areas subsequently requiring fill placement shall be considered. The <br />' Contractor shall be aware of the requirement for selective borrowing from approved borrow <br />sources. Synthetic liner placement shall be coordinated with subsequent drain pipe installation, <br />liner bedding placement, starter berm and cell berm conjwction, and drain fill operations. <br />' The following is a suggested general work sequence for conswcting the facilities shown on the <br />' Drawings. It is intended as a guideline for the Contactor to develop his own work sequence in <br />conjunction with that of the Owner to suit construction equipment and manpower scheduling and <br />meet design requirements. Additional activities required to complete the work, as outlined within <br />' the Specifications and as shown on the Drawings, shall be added by the Contractor. Should the <br />Contractor develop a sequence which would be more acceptable to the Owner, Engineer and <br />' himself let him present it. <br />• Develop access roads to work areas, as needed. <br />' • Develop a site drainage plan and maintenance scheme. <br />• Prepare the embankment and tailings disposal azea foundation for liner installation. <br />' -s- <br /> <br />