My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32598
DRMS
>
Back File Migration
>
Report
>
REP32598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:46 AM
Creation date
11/27/2007 6:17:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1993
Doc Name
SAN LUIS PROJECT TAILINGS DISPOSAL AREA TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i, <br />7.6 Weekly Progress Reports <br />' The Engineer will prepare weekly progress reports summarizing construction and quality control <br />activities. This report, which is submitted to the Owner, shall contain, at a minimum, the <br />following information: <br />• The date, project name, and location; <br />' • A short summary of the week's work activities; <br />• A summary of deficiencies and/or defects and resolutions; <br />' The signature of the Engineer; <br />• Third party laboratory test results, test location, data sheets; and <br />• A short summary will be accompanied by the week's daily reports. <br />' 7.7 Certification Report <br />' The Engineer will submit monthly reports to the Owner. In addition, at the completion of the <br />project, the Engineer shall submit a final certification report. These reports shall certify that the <br />work has been performed in compliance with the construction drawings and Specifications. <br />At a minimum, the monthly and final reports shall contain: <br />• A summary of all construction activities; <br />' • Third Party Laboratory test results; <br />• Observation and test data sheets; <br />• Sampling and testing location plans; <br />• A description of significant construction problems and the resolution of these problems; <br />• A list of changes from the construction drawings and Specifications, and the justification <br />' for these changes; <br />• Record drawings; <br />• Water test; and <br />' • A certification statement signed and sealed by an engineer registered in that State. <br />The record Drawings shall accurately locate all construction items, including the location of <br />piping, anchor trenches, etc. <br />1 <br />1 <br />~z <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.