Laserfiche WebLink
1 <br />' 7.2 Observation and Test Data Sheets <br />' Observation and test data sheets shall include the following information: <br />' Date, project name, and location; <br />• Weather data; <br />• A reduced scale site plan showing work areas, including sample and test locations; <br />• A description of ongoing construction; <br />• A summary of test results identified as passing, failing, or, in the everyt of a failed test, <br />' retest; <br />• Test equipment calibrations, if applicable; <br />' A summary of decisions regarding acceptance of the work and/or corrective actions <br />taken; and <br />• The signature of the Engineer. <br />' 7.3 Construction Problem Report <br />' This report identifies and documents construction problems and resolutions. This report is <br />intended to document problems involving significant rework, and is not intended to document <br />' items which are easily corrected unless the problems are recurring. At a minimum this report <br />shall include: <br />' • A detailed description of the problem; <br /> • The location and cause of the problem; <br />' • How the problem was identified; <br /> • How the problem was resolved; <br /> • Personnel involved; and <br />' • Signature of the Engincer. <br />' 7.4 Photographs <br />Construction activities shall be photo-graphed, including significant problems and remedial <br />' actions. The photographs shall be identified by location, time, date, and photographer. <br />' 7.5 Design and Specification Changes <br />Design and Specification changes may be required during construction. In such cases, the <br />' Engineer shall notify the Owner. Design and Specification changes shall only be made with <br />written agreement of the Engineer and Designer/Owner. <br />' -zi- <br /> <br />