Laserfiche WebLink
,- <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />February 2004 Monthly Report <br />Page 3 <br />Table 2 -February 2004 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to <br />Water feet Total Depth <br />ft Volume of <br />Water ft <br />P6 2/29/04 D 72.46 0.00 <br />P7 2/29/04 92.25 92.50 0.25 <br />P8 2/29/04 96.87 97.51 0.64 <br />P9 2/29/04 71.80 72.30 0.50 <br />P10 2/29/04 57.50 58.30 0.80 <br />P11 2/29/04 41.25 41.80 0.55 <br />P12 2/29/04 41.59 41.71 0.11 <br />P13 2/29/04 41.03 41.34 0.31 <br />P14 2/29/04 Dry 41.24 0.00 <br />P15 2/29/04 Dr 41.10 0.00 <br />Through the end of February 2004 no water treatment plant sludge has been managed for <br />calendar year 2004. <br />Demolition of the San Luis mill facility continued during February. Conversation with <br />the contractors, tentatively it is scheduled that final mill demolition and reclamation will <br />be completed during Spring 2004. <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />February 2004 Monthly Report <br />Page 4 <br />Should you have any questions or comments, please do not hesitate to contact either <br />myself (719) 379-0799 or Mr. Bill Lyle (303) 324-2630 or (970) 325-4482. <br /> <br />F. <br />Coordinator III <br />Cc: Bill Lyle <br />file <br />