Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />February 2004 Monthly Report <br />Page 2 <br />During February, the West Pit water treatment plant operated efficiently discharging a <br />total of 8,339,100 gallons (25.59 acre-feet) of water to Rito Seco Creek and a total of <br />414,600 gallons (1.27 acre-feet) of water was transferred from the water treatment plant <br />to the tailing impoundment. Seepage along Rito Seco Creek remained dry during the <br />month. The monthly precipitation accumulation for February was 1.34 inches, with the <br />largest accumulation occurring on February 20th (0.33"). <br />Table 1-February 2004 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitorin Site Date De th to Water feet <br />M-4R 2/21!04 44.55 <br />M-6 2/21 /04 Dry <br />M-7 2/21/04 Dry <br />M-8 2/21/04 Dry <br />M-9 2/21 /04 141.87 <br />M-10 2/21/04 25.78 <br />M-11 R 2/21 /04 42.48 <br />M-12 2/21/04 179.54 <br />M-13R 2/21/04 130.79 <br />M-14 2/21/04 140.12 <br />M-15 2/21/04 82.69 <br />M-16 2/21/04 24.45 <br />M-19 2/21/04 24.98 <br />M-21 2/21 /04 18.96 <br />M-22 2/21 /04 17.32 <br />M-26 2/21 /04 16.92 <br />M-32 2/21 /04 41.95 <br />M-33 2/21/04 41.27 <br />M-34 2/21 /04 23.33 <br />BF-4 2/21/04 24.99 <br />BF-6 2/21/04 30.81 <br />LS-1 2/19/04 Dry <br />LS-2 2/19/04 Dry <br />LS-3 2/ 19/04 D <br />LD-1 2/19/04 Dr <br />LD-2 2/19/04 Dr <br />LD-3 2/19/04 Dry <br />