BATTLE MOUNTAIN RESOURCES INC-SAN LUIS PROJECT-SYNTHETIC LINER INSTALLATION-TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ <br />' - The break is ductile; or <br />' - The strength of break is as specified in Section 4.2.12.5 of these Specifications. <br />A break through the weld is considered anon-FTB failure if the break is ductile and if the <br />strength is less than the required minimum. The Contractor shall repeat the test in its entirety <br />'' when the test seam sample fails. When repeated test seams fail, the Contractor shall not use the <br />seaming apparatus, or operator for welding until deficiencies or conditions aze corrected and two <br />consecutive successful field test seams are achieved. <br />I 4.2.10 HDPE/VLDPE Tie-In Connection <br />When the design involves HDPE material to be connected with VLDPE material, the following <br />procedure shall be instituted: <br />1 - For geomembrane, overlap of HDPEJVLDPE shall be at a minimum of 5 to 6 inches. <br />At no time will any horizontal slope seams be accepted; <br />' A fusion welder shall be used only to tack the two materials. The fusion welder shall <br />have a temperature setting not to exceed the required temperature allowed for VLDPE, <br />not HDPE; <br />- Once material has been tacked, the overlap shall be trimmed and the seam shall be <br />ground; <br />' - Extrusion welding shall be accomplished by using only very low density polyethylene <br />(VLDPE) rod or beads to join the VLDPE and HDPE; and <br />- Vacuum testing shall be allowable as non-destructive test method used to accept this area. <br />' The Engineer will observe the entire operation and document non-destructive testing. <br />4.2.11 Anchor Trenches <br />i Anchor trenches shall meet all requirements as set forth in these specifications and as shown on <br />' the drawings. Any changes must be submitted to the Engineer in writing prior to excavation <br />andfor geomembrane placement. Anchor trenches shall at all times be clean of large debris <br />' (trash, rocks, etc.). All sharp edges shall be smoothed prior to geomembtane deployment. <br />' -ta- <br />
The URL can be used to link to this page
Your browser does not support the video tag.