My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP31858
DRMS
>
Back File Migration
>
Report
>
REP31858
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:07 AM
Creation date
11/27/2007 6:03:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC-SAN LUIS PROJECT-SYNTHETIC LINER INSTALLATION-TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' deployment. The geomembrane material shall not be folded or dragged and any damage to the <br />geomembrane shall be documented by the Quality Assurance Engineer and Contractor. Damaged <br />geomembrane shall either be repaired to the satisfaction of the Quality Assurance Engineer or <br />removed and replaced with acceptable geomembrane material if the damage cannot be <br />' satisfactorily repaired. Repair, removal and replacement of damaged geomembrane shall be at <br />the Liner Contractor's expense if the damage was caused by the Liner Contractor. <br />' 4.2.5 Geomembrane Conformance Testing <br />4.2.5.1 Tests <br />After delivery, the Engineer will obtain one geosynthetic sample per 100,000 square feet. The <br />sample shall be forwarded to the Third Party Laboratory for the following testis: <br />' - Density (ASTM D-792 Method A or ASTM D-12505); <br />~ - Carbon black content (ASTM D-1603); <br /> - Thickness (ASTM D-1593 or ASTM D-374 Method); <br /> - Tensile characteristics (ASTM D-638); <br /> - Puncture resistance (FTMS lO1B Method 2065); and <br />' - Carbon black dispersion (ASTM D-3015-85). <br />4.2.5.2 Samplin~Procedure <br />Samples shall be taken across the entire roll width and shall not include the fired 3 feet. Unless <br />otherwise specified, samples shall be 3 feet long by the roll width. The Engineer shall mark the <br />machine direction and the manufacturer's roll identification number on the saml-le. <br />' 4.2,6 Geomembrane Resin <br />t The geomembrane resin shall be new, first quality, very low density polyethylene (VI,DPE) <br />resin produced in North America and shall be compounded and manufactured specifically for <br />the purpose of producing flexible membrane. There shall be no intermixing with other resin <br />' types, blending of recycles or seconds, or reclaimed polymer added to the geomernbrane resin. <br />The geomembrane resin shall meet the following Specifications: <br />1 <br /> <br />' -i t- <br />
The URL can be used to link to this page
Your browser does not support the video tag.