My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP31858
DRMS
>
Back File Migration
>
Report
>
REP31858
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:07 AM
Creation date
11/27/2007 6:03:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC-SAN LUIS PROJECT-SYNTHETIC LINER INSTALLATION-TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />1 <br />t <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br />1 <br /> <br /> <br />1 <br /> <br />1 <br />REQUIItED PROPERTIES OF VERY LOW <br />DENSITY POLYETHYLENE (VLDPE) <br /> Typical Property Values <br /> <br />Property Test <br /> Designation 30 mil 40 mil 60 mil <br />Oxidation Induction ASTM D 3895 100 100 100 <br />Time of Polyolefins (minutes, <br /> minimum) <br />Large Diameter Direct ASTM D 3080 19° 19° 19° <br />Shear Interface <br />Friction Angle <br />Determination <br />4.2.4 Delivery. Storage and Handling <br />The geomembrane rolls shall be packaged and shipped by appropriate means so that no damage <br />is caused and shall be delivered to the site only after the Owner receives and approves tht <br />required submittals. The Contractor is responsible for the transportation, off-loading and storage <br />of the geomembrane rolls. Off-loading shall be done in the presence of the Quality Assurance <br />Engineer and any damage during the off-loading shall be documented by the Quality Assurance <br />Engineer and Contractor. Damaged rolls shall be separated from undamaged rolls until proper <br />disposition of material is determined by the Quality Assurance Engineer. Final authority on the <br />determination of damage will be the Quality Assurance Engineer. The Contractor shall replace <br />damaged or unacceptable material at no cost to the Owner. <br />Geomembrane rolls shall be stored on a prepared surface (not on wooden palled) and shall be <br />protected from puncture, dirt, grease, water, mechanical abrasions, excessive heat or other <br />damage. The geomembrane will be stacked no more than three rolls high. Tlie Owner will <br />allocate sufficient space to store the geomembrane rolls. <br />Any damaged rolls shall be rejected and removed from the site or stored at a location, separate <br />from accepted rolls, designated by the Owner. All rolls which do not have proper manufacturer's <br />documentation shall also be stored at a separate location until all documentatyon has been <br />received and approved. <br />The Contractor is responsible for on-site handling of the geomembrane and shall use appropriate <br />handling equipment to load, move or deploy geomembrane rolls. Appropriate handling <br />equipment includes cloth chokers and spreader bars for loading, and spreader and roll bars for <br />' -ia <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.