Laserfiche WebLink
i~ <br />The Contractor shall provide a copy of the quality control certificate for production of <br />geomembtane as well as the resin manufactured for this project seven days prior to receipt at <br />site. The quality control certificate for the geomembrane shall include the following: <br />- Statement of the production date or dates; <br />- Laboratory certification that the 40-mil VLDPE meets the Specifications outlined in <br />1 Section 4.2.3.2; <br />- Certification that all VLDPE rolls are from the same VLDPE supplier; <br />- A copy of quality control certificates issued by supplier; <br />' - Test reports from the supplier; and <br />' - A statement that no reclaimed polymer was added. <br />The Contractor shall provide certification that the geomembrane and exwdate pboduced for this <br />project have the same properties represented in the material Specification sheeq in addition to <br />' meeting NSF-54 requirements. A copy of the quality controUquality assurance (QC/QA) program <br />for geomembrane production shall also be provided. Before acceptance of installation by the <br />Owner, the Contractor shall furnish reproducible record as-built drawings showing, at a <br />' minimum, panel numbers, seam numbers, seaming equipment and operator identification, <br />temperatures and speed settings of equipment, seam date and location of patches urd destructive <br />' seam samples. The liner material and workmanship shall be guaranteed according to the <br />warranty in Section 4.2.3 of these Specifications. All submittals shall be subject to approval by <br />the Owner. <br /> <br /> <br />1 <br /> <br /> <br />7 <br />