Laserfiche WebLink
<br />SIL OAM 9TON E, INC. PAGE 2 <br />HE~ROGK MINE #1 <br />M-1 997.OH6 <br />MARCH 14, 206 <br />(2) No reclamation was required but as in the past we continue to <br />fill and cleanup the pre-law disturbed area by filling, grade <br />d, and shaped the areas on the perimeter (orange). In addi- <br />tion, a portion of the pre-law disturbed area has been leveled <br />for use as a clay storage area (1.90 ac. ±, magenta). We have <br />approximately 43,400 cy of topsoil saved for reclamation, <br />located in 3 piles around the mined area (brown). <br />(3) Mining will continue in the pink colored field stone areas and <br />on the slab stone areas in Stage 1 (blue). We will continue <br />to remove stockpiled stone, in the stone piles (yellow), stone <br />yards (purple) and on surrounding areas. This year we expect <br />to expand the slab stone mine area by 2.0 ac ± adjacent to <br />where we are mining this year. The stone yard area is indus- <br />trial area and would need no reclamation if mining ended <br />prematurely. <br />(4) Reclamation is being completed as required in the permit, we <br />are within the bonded limits set in 1998. We will reclaim any <br />areas that are in their final configuration as mining pro- <br />gresses this year. We may begin to reclaim the northern end <br />of the slab stone area this year. <br />(5) The current contact for this operation is: <br />Mr. Matt Mueller Phone J/ ~~ 275-4275 <br />Siloam Stone, Inc. <br />315 N 7th St. <br />Canon City, CO 81212 <br />The effective date of all information contained herein is <br />March 13, 2006. A check for $688.00 is attached to cover the <br />annual fee for 2004 and the 2005-2006 annual report map reflects <br />the areas discussed in this report. <br />Respectfully Submitted, <br />Siloam Stone, Inc. <br />~~~ <br />Matt Mueller <br />enclosure <br />cc Environment, Inc. <br />file <br />