Laserfiche WebLink
• • <br />Form C-2: Financial Assurance Cost Estimate for Post-Closure Care <br />Facility Name: Sedalia Recycling Center and Depository <br />• <br />October 2000 <br /> <br />ITEM <br />BASIS FOR COST UNIT <br />QTI' <br />UNITS UNIT <br />COST UNIT <br />COST" EVENTS <br />PER YR ITEM COST <br />PER YEAR <br />' Site Inspections/Reponing Includes one person one day 1 ea 875.67 2 51,751.34 <br /> p us summary repo <br />• Maintenance/Repairs <br />Erosion Damage Repair Assumes soil loss of 0.9 cy/ac 67.5 cy 39.15 2 N/A <br />Vegetation and Soil Amendments Assumes 10%of site <br /> requires amen men acre <br />Gas Collectiottll'reatment System 5%of system cost NA LS 5% N/A <br />Groundwater and Gas Wells pump repair/replacement 1 LS 515.10 N/A <br /> average per year <br />Leachate Collection System line cleaning (estimated) 16000 LF 0.33 I 55,280.00 <br />• Monitoring <br />Groundwater <br />Mobilize/Demobilize 1 hr 36.06 2 572.12 <br />Sampling and Analysis 3 hr/sample + Append lA&.IB 6 well 339.97 2 54,079.64 <br />Report Preparation 1 LS 3090.60 2 56,181.20 <br />Leachate Ihr/sample+Append lA&IB+ NA location 782.95 <br /> repo per sump oca ton <br />Gas Alt 2 well locations per hr NA well 20.60 N/A <br />' TreatmenUDisposal <br />Leachate disposal At treatment plant NA gal 0.02 N/A <br />Gas Condensate Disposal At treatment plant NA gal 0.02 N/A <br />' Other <br />SUBTOTAL 529,726.70 <br />Administrative Cost (5%) I LS 0.05 2 51,486.34 <br />Contingency Cost (5%) 1 LS 0.05 2 51,486.34 <br />TOTAL COST PER YEAR 532,699.37 <br />TOTAL COST PER 30 YEAR PERIOD 5980,981.10 <br />Unit Cost Abbreviations <br />cy =cubic yard LS =lump sum <br />sf =square foot ea =each <br />sy =square yard gal =gallon <br />LF =linear (not hr =hour <br />' Please provide backupjustification for unit costs entered in this column <br />October 2000 <br />wmivia~vir.swcia.w Sedalia Recycling Center and Depository 003-2191 <br />