Laserfiche WebLink
Form C-1: Financial Assurance Cost Estimate for Closure <br />• Sedalia Recycling Center and Depository <br /> <br />October 2000 <br /> <br />ITEM UNIT <br />QTi' <br />UNIT UNIT <br />COST UNIT <br />COST" <br />ITEM COST <br />105 mil, non-woven $0.00 sy 1.71 $0.00 <br />130 mil, non-woven $0.00 sy 2.27 $0.00 <br />170 mil, non-woven $0.00 sy 3.04 $0.00 <br />• Other: $0.00 <br />Miscellaneous Cost Subtotal 50.00 <br />ENGINEERING MANAGEMENT <br />' Construction Inspection/Oversight I8 wk 1224.85 $22,047.30 <br />• Surveying 30 day 618.00 $18,540.00 <br />* Construction Design documents/CQA Manuals/CQA reports LS 5% $43,752.00 <br />• Other: <br />Engineering Management Cost Subtotal $84,339.30 <br />CLOSURE COST ESTIMATE SUBTOTAL $959,382.50 <br />• Zip code adjustment factor 0.89 $853,850.43 <br />• Administrative Cost (5%) LS 5% $47,969.13 <br />* Contingency (5%) LS 5% $47,969.13 <br />CLOSURE COST ESTIMATE TOTAL $949,788.68 <br />Unit Cost Abbreviations <br />cy =cubic yard ac-ft =acre feet <br />sf =square foot ea =each <br />sy =square yard gal =gallon <br />LF =linear foot Qty =quantity <br />LS =lump sum <br />• Please provide backup justi5cation for unit costs entered in this column <br />• <br />October 2000 Page 6 of 6 <br />WOI31912191 T.bIaCIC3..b Sedalia Recycling Center and Depository 003-2191 <br />