Laserfiche WebLink
New Elk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPO~TE <br />aa~i CE~~/E® <br />CDMR Rules 4.09.1(11) and 4.10.2(2) DEC 3 ~ 212 <br />~ivlslon of 1 y(oerals and CeoloBY <br />Mine: NEW ELK <br />Waste Bank MSHA ID. No.; Primary Refuse Disposal Area (RDA) <br />Inspection Period: Fourth Quarter 2002 <br />Inspection Date: 12/3/02 <br />General Description or Reference to Site Plan: <br />The Refuse Disposal Area is located north of State Highway 12 and the Middle Fork of the <br />Purgatoire River. Refuse is transported from the preparation plant to the RDA by conveyor belt. <br />The plant has been idle since March of 1996 at which time the last refuse was placed on the <br />fill area. <br />Activity During Inspection: <br />Area was inactive thoughout the inspection and during the quarter. Drainage ditches <br />along beltline to the front face of the upper bench were cleaned out in October. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction and/ <br />or discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse side slopes. Positive drainage is established on <br />all areas. Vegetation is well established on previously reclaimed areas. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />No fill was placed during the quarter. <br />Page 1 of 2 <br />