Laserfiche WebLink
e• <br />R8M 'EfJGR. & ENVIRON <br />Vbv~ <br />Monitoring <br />Locations: <br />Chemical <br />parameters: <br />Monitoring <br />frequency: <br />ID~303-930-4193 <br />JUL 08'94 9~UU No .002 P.02 <br />Table 4.6-54 <br />Water Quality Paremetere <br />TR-1.5, TR-3, TR-4, WR-1 <br />[omnlele list Partial List <br />pli Sulfate pH <br />Temperature Calcium Specific Conductance <br />Specific Conductance Magnesium Temperature <br />Orthophosphate as P Sodiwo Water level <br />Nitrite Menganese Total Dissolved Solids <br />Bienrbonate Iron <br />Chloride Total Dissolved Solids <br />potassium Water level <br />Cam' lets list -- 3 times n year <br />let - Approximately 30 days after the first surface water <br />complete lie l• analyses sampling. <br />2nd - Mid summer (July or August). <br />3rd - Late fall just prior to winter freeze. <br />Par-ial l;at -- monthly (except during winter freeze up). <br />~~I', +^ ' April through October, <br />~~ Monitoring <br />Locations: TR-A. TR-H, TR-C, TR-D <br />Chemical <br />parameters: <br />Temperature Sulfate Temperature <br />pH Hicarbonnte pH <br />Specific Conductance Sodium Specific Conductance <br />Total Dissolved Solids Calcium Flow (TR-s, TA-b) <br />Total Suspended Solids Magnesium Total Dissolved Solids <br />Orthophosphate ne P Aluminum <br />Nitrite Manganoso <br />Unionized Ammonia Potassium <br />Chloride Flow (TR-n, TR-b) <br />Iron <br />Monitoring <br />frequency: o n t -- 3 times a year <br />1st - During spring runoff at the mina site, but prior to <br />runoff upstream (March - April). <br />2nd - Mid summer (July - August). <br />3rd Lnte fall just prior to winter freeze. <br />Part;a] list -- monthly (except during winter freeze up) <br />April through October. <br />4.6-144 May 31, 1994 <br />