Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />Februazy 2003 Monthly Report <br />Page 3 <br />Table 1-February 2003 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements (continued) <br />Monitorin Site Date De th to Water feet <br />BF-4 2/28/03 25.95 <br />BF-SR 2/28/03 31.74 <br />BF-6 2/28/03 31.71 <br />BF-7R 2/28/03 43.45 <br />BF-8 2/28/03 Dr <br />BF-9 2/28/03 42.80 <br />BF-10 2/28/03 43.85 <br />BF-I1 2/28/03 44.72 <br />BF-12 2/28/03 43.01 <br />BF-13 2/28/03 35.41 <br />BF-14 2/28/03 34.99 <br />DW_1 2/28/03 34.22 <br />DW-2 2/28/03 26.88 <br />pW_1 2/28/03 29.13 <br />pW_2 2/28/03 28.97 <br />PW_3 2/28/03 36.97 <br />PW_4 2/28/03 32.39 <br />P W_5 2/28/03 28.08 <br />SF-1 2/28/03 17.57 <br />SF-1 R 2/28/03 20.29 <br />SF-2 2/28/03 25.01 <br />SF-3 2/28/03 43.70 <br />SF-4 2/28/03 26.72 <br />SF-5 2/28/03 33.36 <br />pC_2 2/28/03 40.14 <br />D8724 2/28/03 60.32 <br />LS-1 2/27/03 Dr <br />LS-2 2/27/03 Dr <br />LS-3 2/27/03 Dry <br />LD-1 2/27/03 Dry <br />LD-2 2/27/03 Dr <br />LD-3 Z/27/03 Dry <br />