Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />February 2003 Monthly Report <br />Page 2 <br />system yielding a monthly average of 13.10 gpad. <br />During February, the West Pit water treatment plant operated efficiently discharging a <br />total of 8,777,600 gallons (26.94 acre-feet) of water to Rito Seco Creek, a total of <br />563,700 gallons (1.73 acre-feet) of water was transferred from the water treatment plant <br />to the tailing impoundment, and seepage along Rito Seco Creek remained dry. <br />Table 1-February 2003 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitorin Site Date De th to Water feet <br />M_ 1 2/28/03 74.27 <br />M-10 2/28/03 25.70 <br />M-11 2/28/03 38.45 <br />M-11 R 2/28/03 45.60 <br />M-16 2/28/03 26.55 <br />M-17 2/28/03 33. I 1 <br />M-18 2/28/03 27.52 <br />M-I 9 2/28/03 24.51 <br />M-20 2/28/03 25.59 <br />M-21 2/28/03 18.23 <br />M-22 2/28/03 16.82 <br />M-23 2/28/03 46.12 <br />M-24 2/28/03 27.47 <br />M-25 2/28/03 Dr <br />M-26 2/28/03 18.54 <br />M-27 2/28/03 Dry <br />M-28 2/28/03 25.78 <br />M-29 2/28/03 27.71 <br />M-30 2/28/03 28.02 <br />M-31 2/28/03 45.34 <br />M-32 2/28/03 49.40 <br />. M-33 2/28/03 47.20 <br />M-34 2/28/03 22.38 <br />BF-1 2/28/03 28.76 <br />BF-2 2/28/03 32.35 <br />BF-3 2/28/03 30.73 <br />