Laserfiche WebLink
Mr. Robert Peterson - 2 - February 4, 1992 <br />5. Please generate a table for future reports which indicates surface, <br />groundwater, and spring locations. An example is shown below. <br />Site Field Full Suite <br />SW-2 Q S (June, Oct) <br />MW-3 Q A (Oct) <br />5P2 Q A (June) <br />Springs A -- <br />Q = Quarterly <br />S = Semi-Annual <br />A = Annual <br />Also list the required constituents that the samples are tested for and <br />consider that different full suites may exist between surface and <br />groundwater. Again, this assists in reviews, eliminates confusion, and <br />allows for a more efficient and complete review. <br />6. Mercury was not tested for on the 9/30/91 sample for site MW-3. Please <br />explain this discrepancy. <br />7. As per Rule 4.05.6(13), <br />registered professional <br />a quarterly schedule in <br />Overall, the report is well <br />at the present time. Please <br />convenience. <br />Sincerely, <br />i L /~,~- <br />•~ 7 =--, <br />Kent A. Gorham <br />Reclamation Specialist <br />KAG/yjb <br />sediment ponds are required to be inspected by a <br />engineer on a quarterly basis. Please adhere to <br />the future. <br />organized and no impacts from mining are evident <br />respond to the above items of concern at your <br />1109E <br />