Laserfiche WebLink
_. <br />QUARTERLY REPORT FOR OAKRIDGE ENERGY PERMIT <br />MAINTENANCE ITEMS NOTED <br />A. CARRY OVER ITEMS FROM PREVIOUS REPORTS: <br />The flatter portions of the main drain ditches should be checked for siltation. Any <br />excess siltation should be removed and the ditch returned to its design trapezoid. <br />2. Rip-rap needs to be added to the channel section, as shown on Map 5-10. <br />3. Special road crossing needs to be completed, as shown on Map 5-10. <br />GOFF ENGPIEERING & SURVEYWG, IIJC. <br />January 25, 1999 <br />