Laserfiche WebLink
-- <br />ENGINEERING 8 SURVEYING, INC. <br />III IIIIIIIIIIIIIIII <br />999 <br />555 SOUTH CAMINO OEL RIO <br />BODO PROFESSIONAL CENTER UNIT A-I <br />POST OFFICE BOX 97 <br />DU RANGO. COLORADO 81302 0097 <br />TELEPHONE 970~Z47 7705 <br />FAX 970-247 171 O <br />CONSULTING CIVIL AND SANITARY ENGINEERING <br />LAND, UTILITY AND CONSTRUCTION SURVEYS <br />January 25, 1999 <br />Harry Ranney <br />Colorado Division of Minerals & Geology <br />1313 Sherman Street -Room 215 <br />Denver, CO 80203 <br />RECEIVED <br />JAN 2 8 1999 <br />:,soon nt t,;lrlera:~. r <br />RE: CARBON JUNCTION MINE; NO. C-92-080; FOURTH QUARTER REPORT, 1998 <br />Dear Mr. Ranney: <br />Daring the previous quarter (through December 31, 1998) the reshaping of the fill pile <br />and topsoil capping work continued. <br />Three of the items which remain from my last (10-30-98) report still need attention (see <br />attached). <br />As we have discussed over the phone, I will be submitting a final report on the <br />completion of the fill pile as soon as we complete the topographic survey and the slope stability <br />analysis. <br />V <br />H <br />cc: 1) Jim Hendricks <br />2) Mike Savage <br />