My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-16_REPORT - M1997086
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1997086
>
2007-03-16_REPORT - M1997086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:37:36 AM
Creation date
11/27/2007 5:30:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997086
IBM Index Class Name
Report
Doc Date
3/16/2007
Doc Name
Annual Fee/Report/Map
From
Siloam Stone, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SILOAM STONE, INC. <br />BEDROCK MINE #1 <br />M-1 997-086 <br />MARCH 13, 2007 <br />PAGE 2 <br />approximately 43,400 cy of topsoil saved for reclamation, <br />located in around the mined area (brown). At this time there <br />is 5.25 acres ± in the mine that is partially reclaimed. This <br />year approximately 4.17 acres was resoiled and graded in the <br />northwest quadrant of the mined area (green). This area is <br />ready for seeding. <br />(3) Mining will continue in the pink colored field stone areas and <br />on the slab stone areas in Stage 1 (blue). We will continue to <br />remove stockpiled stone, in the stone processing area, stone <br />yards (purple) and on surrounding areas. This year we expect <br />to expand the slab stone mine area by 2.0 ac ± adjacent to <br />where we are mining this year. The stone yard area is indus- <br />trial area and would need no reclamation if mining ended prema- <br />turely. <br />(4) Reclamation is being completed as required in the permit, we <br />are within the bonded limits set in 1998. We will reclaim any <br />areas that are in their final configuration as mining pro- <br />gresses this year. We may begin to reclaim the northern end of <br />the slab stone area this year. <br />(5) The current contact for this operation is: <br />Mr. Matt Mueller Phone fl (719J 275-4275 <br />Siloam Stone, Lac. <br />315 N 7th St. <br />Canon City, CO 812(2 <br />The effective date of all information contained herein is March <br />9, 2007. A check for $688.00 is attached to cover the annual fee for <br />2006 and the 2006-2007 annual report map reflects the areas discussed <br />in this report. <br />Respectfully Submitted, <br />Siloam Stone, Inc. <br />•~.e~~ <br />Matt Mueller <br />enclosure <br />cc Environment, Inc. <br />file <br />..,.. <br />~_~ ~~~.~ _,_ ~_ _-, ~,_.__.~_~~_ K. <br />
The URL can be used to link to this page
Your browser does not support the video tag.