Laserfiche WebLink
2003 Annual Report <br />Table Mt. Quarry <br />M-1999-004 <br />Castle Concrete Company <br />DECEIVED <br />JUL 2 2 2003 <br />division ~f Minerals and Geology <br />Overview of Permit Year: Mining continues at a steady rate. Over the past <br />year the mining amendment was passed. This amendment will allow Castle <br />access to the BLM quarter section. <br />Annual Report Map: There are two maps with this year's annual report. One <br />map shows the intended mining direction while the other shows the mining area <br />in more detail. Right now I'm in the process of developing a method to <br />accurately revise annual maps using ahand-held GPS unit. <br />Activity: Most of the mining activity has been concentrated on the north and <br />west sides of the quarry. When mining reaches as far west as possible the <br />direction will trend northeasterly. See map for details. <br />Reclamation: Avery small amount of land (~ '/a acre) was seeded west of the <br />green grizzly screen. Fox details on the seeding please refer to the seed mixture <br />document. <br />Expected Activity: Mining will continue to the north and west. Also, Castle <br />plans on extracting quartzite from the BLM lands. <br />