Laserfiche WebLink
4.1.6 Buildings <br />The process facilities, control room, lab and warehouse are housed in a metal 120' x 220' <br />building. Smaller buildings house lubricants, fire pump and electrical equipment. Three <br />office storage and sleeping trailers are on site to support the drilling activity. The product <br />storage building is a 100' diameter pre-engineered concrete and wood frame structure. <br />4.1.7 Wells within the W~`~ease Boundaries <br />In addition to cavity #1 production wells 88-1V (Vertical) and 90-5H (Horizontal), and <br />cavity #2 production wells 91-1V and 91-2H, two new production wells for 1994 were <br />drilled, completed, and produced. The new wells 93-3V and 93-4H, were utilized for <br />miping cavity #3. An additional sonar/subsidence monitoring well was completed 500' <br />4 <br />north of 93-3V. A summ<3ry of wells follows: <br />Prior to 199• 13 water monitoring wells <br />1 water supply well <br />4 production wells <br />lsonar/subsidence well <br />Durino 1994 2 production wells <br />1 sonar/subsidence well <br />Refer to Table 4-1 for narnes and description of existing wells. <br />4.1.8 Other Activities <br />The mud pit near sonar monitoring well 93-2M was lined and the area fenced for disposal <br />i bicarb contaminated soil. A power line installed to the waste pond to operate a <br /> <br /> <br />