Laserfiche WebLink
<br />1 <br /> <br /> <br /> <br />1 <br />1 <br /> <br />1 <br /> <br />ll <br /> <br />knob could be borrowed instead of borrowing the same amount of material from the upper <br />impoundment. The Imob made an ideal borrow for the random fill (zone 4) in the main <br />embattlattent. <br />The lower areas of the lower impoundment excavation consisted mainly of alluvial sands and <br />gravels. The north side of the alluvial deposit was composed of clean gravelly sands. The south <br />side of the alluvial deposits had a higher silt content. Material from the alluvial deposit was <br />borrowed selectively and used for Type 1 and 2 fills on the main embanlQnent and drain blanket <br />fills and Type 4 material in the sputter embattlattent fill. <br />2S Collection Pond Foundation <br />The collection pond foundation was located in the alluvial plain of the valley. Clean sands and <br />gravels were encountered at the fmal depth of the excavation. <br />3.0 EARTHEN STRUCTURES <br />In total, there are folic ma}or earthen structwes in the tailings disposal area, consisting of the main <br />embankment, the sputter embattlQttent, the collection pond, and the south diversion channel. All <br />earthen structures were constructed using materials which were borrowed from the tailings <br />impoundment facilities excavations. The materials from the impoundment excavations were <br />borrowed selectively based on the gradation and the size of the deposit. The on site materials were <br />classified into four separate categories, referred to as Type 1, 2, 3, and 4. In general, the materials <br />would be descn'bed as follows: <br />Type 1: sandy gravels <br />Type 2: fine gravelly Sand <br />Type 3: sandy silts <br />' Type 4: random fill <br />For detailed classifications refer to the tailings disposal area specifications. <br />3.1 Main Embanluaent <br />' The main embankment was constructed utilizing four Types of material as depicted in SRK as-built <br />Drawing No.14711-104. Fill placement on the main embanlanent commenced in Badly August 1990 <br />1 <br />8 <br /> <br />