Laserfiche WebLink
~• <br /> <br />To the best of my knowledge, based upon my professional expertise, <br />the permanent refuse structures at the Deserado Mine are being <br />constructed in conformance with the prudent state-of-the-art of <br />coal processing waste bank construction. Further, the structures <br />are being constructed in compliance with the approved design, as <br />specified within Section III-20 of the approved permit documents <br />and depicted on Maps 76,77,82 and 83. <br />I certify, eased upon my field observations and professional <br />investigations, as detailed here above, that the permanent refuse <br />disposal structures at Western Fuels-Utah, Inc., Deserado Mine, <br />located in Rio Blanco County, Colorado, are being constructed in <br />compliance with the design approved as a portion of Permit No. C- <br />018-81, issued by the Colorado Mined Land Reclamation Division. <br />Resl~ect~ully, <br />~ ~ <br />:~ j-~~~~D~~ ~~~ <br />MicY.ael ~•. Wed, .E. <br />4 /~ <br />Mina b:a;lager <br />C~lol-ado Registered P.E. No. 19143 <br />MJW:pb <br />cc: Don Deardorff <br />Wayne Hellmann <br />Tim Chervick <br />File <br />-,~yi. w, <br />'e <br />v 191a3 <br />.e <br />.~ <br />.•'., <br />ti~+w•~.•'~G•i . <br />~ONI,E EM <br />