Laserfiche WebLink
Page 2 <br />This is a report of an inspection. <br />Rule 4.10.1(1)(b) To prevent combustion. <br />Materials were being compacted to prevent combustion. <br />Rule 4.10.2(1) All coal mine waste banks shall be inspected, on behalf of the person conducting <br />surface coal mining operations by a qualified registered engineer, or other qualifred <br />professional specialist under the direction of the professional engineer, experienced in <br />construction of similar earth and waste structures, approved by the Division. <br />See Rule 4.09.1(11)(a) above. <br />Rule 4.10.2(2)(a) Inspection shall occur at least quarterly, beginning within 7 days after the <br />preparation of the disposal area begins. The Division may require more frequent inspection <br />based upon an evaluation of the potential danger to the health or safety of the public and the <br />potential harm to land, air and water resources. Inspections may terminate when the coal mine <br />waste bank has been graded, covered in accordance with 4.10.4(4), topsoil has been distributed <br />on the bank in accordance with 4.06.4, and revegetated, or at such a later time as the Division <br />may require. <br />