Laserfiche WebLink
<br /> <br />Cooley Gravel Company <br />Morrison Quarry Permit #73-21 AUG 1• <br />Annual Report ~ ~5. <br />June 1984 through May 1985 MINED LAND <br />RECLAMATION DIVISION <br />1. Location and number of acres affected during that year. <br />Because of the long term nature of the quarry <br />operation, the accurate answers to this question <br />may be misleading. The total current disturbance <br />on site is about 68 acres. This is the area <br />within the dashed line on the map. Of the sixty <br />eight total acres disturbed, approximately 18.2 <br />acres have been disturbed for the first time <br />within this report period. (The area within the <br />striped line.) <br />2. Location and number of acres reclaimed for that year. <br />1.8 Acres reclaimed as measured from the map. The <br />areas reclaimed are enclosed by a solid black <br />line, and clearly labeled. The 1.8 acres is <br />located in two different areas. One area was the <br />fill slope east of the load-out bins. The other <br />area was the top bench in the central quarry. <br />3. The location and number of acres in various stages of <br />reclamation. <br />Central <br />Quarry <br />(Top Bench) Fill Slope Total <br />Backfilled 1.4 Acres 0 Acres 1.4 Acres <br />Graded 1.4 Acres 0 Acres 1.4 Acres <br />Topsoiled 1.4 Acres .4 Acres 1.8 Acres <br />Revegetated 1.4 Acres .4 Acres 1.8 Acres <br />4. The species of vegetation planted, the locations and <br />approximate dates of planting. <br />Location: Fill Slope East of load-out bins. <br />Date: Early June 1984 <br />