Laserfiche WebLink
E~ <br />r. <br />328 - Pit Water (Pit i) *~~ ~`~~' <br />1. Water Monitoring Schedule at SSS: <br />These sites are to be visited once per week during March <br />through June, and once per month during July through <br />October. No monitoring is required at these sites during <br />November through February. <br />Station: Plan: <br />300 C <br /> D (Apr. & Oct.) <br />306 C <br /> D (Apr. & Oct.) <br />314 C <br /> D (Apr. & Oct.) <br />327 C <br /> D (Apr. & Oct.) <br />328 C <br /> D (Apr. & Oct.) <br />All stations are monitored under plan C,except in the <br />first week of measurable flow in April and the last time <br />in October when they are measured under plan D. <br />F. SS Stations: <br />316 - Loadout - Swamp on Wildlife Refuge approximately 300 <br />feet south of Loadout. <br />317 - Loadout - Culvert under RR tracks at south boundary of <br />Loadout. <br />318 - Loadout - Culvert at entrance to Loadout. <br />1. Water Monitoring Schedule at SS: <br />These sites are to be visited once each week during March <br />through June, and once per month during July through <br />October. No monitoring is required at these sites during <br />November through February. <br />Station: Plan: <br />316 E <br />317 E <br />