Laserfiche WebLink
30i - Pond A <br />302 - Pond B <br />303 - Pond C <br />304 - Pond D <br />305 - Pond E <br />319 - Loadout Pond <br />320 - Loadout Ditch <br />321 - Pond F <br />322 - Pond G <br />1. Water Monitoring Schedule at SDP Stations: <br />Each of the sites is to be visited once per week during <br />March through June, and once per month during July <br />through October. No monitoring is required at these <br />sites during November through February. <br />station: Plan: <br />301 B <br />302 B <br />303 B <br />304 B <br />305 B <br />319 B <br />320 A <br />321 B <br />322 B <br />E. SSS Stations; <br />300 - Pond A drainage above pond at south permit boundary <br />306 - Bush Draw - downstream from Pond G <br />314 - Bush Draw - upstream from mine area <br />327 - Bolton Draw - at Noffsinger road crossing <br />