Laserfiche WebLink
<br /> <br />March 21, 1989 (Annual Report, page 3, ?fLF.B Permit - X177-573) <br />Stage III, part 2 <br /> <br />VALCO, INC. <br />PUEBLO CONCRETE DIVISION <br />P. O. BOX 857 <br />PUEBLO,COLORADO 81002 <br />X719)561-8350 <br />Backfill, grading and topsoil replacement has been completed on all <br />but 700 feet of the southside. Annroximately 10 trees have been <br />planted on the southside, rrass plan tine and fertilization was <br />started in April of 1988 on the southside, This will resume in 1989. <br />for the remainder of the area, <br />Stage IV, part 1 <br />Backfill, grading and tonsoil replacement has peen completed f.or the <br />entire area. Crass planting, and fertilization will start in 1989. <br />Stage I7, part 2 <br />Backfill, grading and tonsoil replacement has been completed on the <br />westside. Rackfillin¢ will continue for the entire area i.n 1989. <br />4, brass was planted in Stage I and II starting on 3/24/88 and running into <br />the first week of April, 1988. grass was planted in Stage 7II, part 2, <br />starting on April 4th, 1988 and continuing for approximately 7 days. <br />it consisted of a mixture of Western hiheaterass (51.86%), Crested 4?heatgrass <br />(28.84%), Yellow Sweet Clover (10.42%). <br />The trees that were planted in Stage III, Dart 2, consisted of Russian dive, <br />Catalpa, and Maple, <br />5. Approximately 100 lbs. of 18-46-0 Fertilizer was used for the grass that was <br />planted in 1988. <br />6. In 1988 - 1989 (3/22/88 thru 3/22/89) ~~alco Inc. was very successFUl i.n their <br />Reclamation efforts. <br />7. Estimate of Affected Acres for the coming year, 1989 - 1990 (3/22/89 thru <br />3/22/90) <br />Stage V = 14.33 acres <br />west part of Stage !!I = 1,79 acres <br />Sincerely amours, <br />/~ a~.iC-e.u~, <br />Ma k Klune <br />general Manager, Valco Inc. <br />Pueblo Concrete Division <br />LAMAR ROCKY FORD CANON CITY GUNNISON CRESTED BUTTE <br />