My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP28263
DRMS
>
Back File Migration
>
Report
>
REP28263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:58 PM
Creation date
11/27/2007 5:00:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977573
IBM Index Class Name
Report
Doc Date
3/22/1989
Doc Name
ANNUAL REPORT VALCO INC PUEBLO CONCRETE DIV PN 77-573 PUEBLO COLO WEST PIT
From
VALCO
To
MLRD
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-. <br />March 21, 1989 ~AClnudl Report, pace 2, ~1LP.R Permit - ~t77-573) <br />Stage IV, ParC 1 <br />sovthside - Rackfill, <br />completed <br />Pastside - Backfill, <br />completed <br />Northside - Backfill, <br />completed <br />Stage IV, Hart 2 <br />Westside - Backfill, grading and topsoil replacement has been <br />comnleted = ,75 acres <br />3. Stages of Reclamation <br />Stage 0 <br />Conveyor was removed from the sovthside of this area, numn ni.pes <br />remain in this area. Then nines are removed, backsloping will start. <br />in about August, 1989. This should complete this area. <br />Stage I <br />Rackfill, grading and topsoil replacement has been completed on <br />entire area. Approximately 30 trees have been planted on the <br />D~orthside. brass planting and fertilization started on 3-24-88 <br />on the south, east and north sides. Additional planting will resume <br />this year onf the north and west sides. <br />Stage II <br />Backfill, grading and topsoil replacement has been completed on <br />entire area. Approximately 70 trees have been planted on the <br />sovthside. brass planting and fertilization was resumed in April <br />of 1988 on the south and north sides. This should complete this area. <br />Stage III, part 1 <br /> <br />VALCO, INC. <br />PUEBLO CONCRETE DIVISION <br />P. O. BOX 857 <br />PUEBLO,COLORADO 81002 <br />~779~561-8350 <br />cradin¢ and topsoil replacement has been <br />_ ,46 acres <br />trading and topsoil replacement has been <br />_ .35 acres <br />grading and topsoil replacement has been <br />_ .46 acres <br />This area will continue to be filled in during the coming year with <br />material from the crusher plant. <br />LAMAR <br />R OCKY FORD <br />CANON CITY CRESTED BUTTE <br />GUN NISON <br />
The URL can be used to link to this page
Your browser does not support the video tag.