Laserfiche WebLink
<br /> <br />~~ <br />1. Adequate surface drainage should be provided around the rear of <br />the tailings embankment to conduct surface run off from adjacent terrain <br />' away from the beach area. <br />2. Revegitation of the pond embankment should be made for erosion <br />' control and stability. <br />3. Periodic inspections should be made of the toe drain to insure <br />~ , that it is functioning properly and that no fluid buildup is occurring behind <br />' the earthen berm. <br />' REVIEW <br />We are available to discuss the details of our conclusions and recommendations <br />' with you. This is especially true if it is desired to continue use of <br />pond 3. Additional recommendations and analysis can be provided for design <br />' and construction of future tailings embankments or the addition to pond <br />' 3 if desired. <br />Please call when further consultation is required. Thank you for <br />' the opportunity of working with you on this project. <br />F, M. FOX & ASSOCIATES, INC. Reviewed by: ~/. <br />' f // ~ ////////~ :O~ <br />//J:nL~~~4 a~Y\ V\ <br />Donald R. Clark Robert B. Sennett <br />Project Engineer ~.•~"'pNSO"'', Vice President <br />~••t ~R..... N SrE''•, <br />=~ <br />Copies: 5 _ <br />+, 4T10 <br />s• *~ <br />:o WW; 2 <br /> <br />1 <br />' -9- <br />